Welcome to the new Halfen UK newsletter.
Up to date news and information is also available at www.halfen.com/uk.
Topics
  • HALFEN HIT Balcony Connections: 2 hour fire protection as standard
  • HALFEN sets new standards with the HTA-CE Plus!
  • HK5 – with increased load capacities and reduced thermal heat transfer
  • Video: HALFEN HIT Insulated connections for cantilevered structural components and balconies
  • Fewer movement joints with the new HALFEN HIT Insulated connections
HALFEN HIT Balcony Connections: 2 hour fire protection as standard
Structural fire protection is a complex issue that should not to be neglected. Interpretation of the regulations and their correct application requires comprehensive know-how.

An uncomplicated and above all a reliable solution is available for balcony connections. Class A1 rock wool material is used in all HALFEN Insulated HIT-HP and HIT-SP connection elements for energy-efficiency, and also for fire protection. Consequently, HIT elements meet the highest fire resistance REI 120 classification as standard.
read more
HALFEN sets new standards with the HTA-CE Plus!
The classic anchor channel is now ready for a leap in its evolution: Thanks to outstanding engineering improvements and multiple optimized details a new, more efficient HALFEN channel is now available.

The innovative hot-rolled HALFEN HTA-CE plus channels provide you the following benefits:

  • Due to the new, higher load range more applications can be covered with the new HTA-CE 40/22P and HTA-CE 50/30P channels. This reduces the risk of channel and bolt confusion on your construction site and in your precast plant.
read more
HK5 – with increased load capacities and reduced thermal heat transfer
Combining timeless design with long life and low maintenance costs: the brickwork façade. To ensure that brickwork façades continue to meet the increasing demands for energy efficiency, we have been continuously developing our brickwork support over the years.

The HK5 is the latest generation of brickwork support. Improvements in geometry and material mean a more energy efficient, stronger and more economical bracket.
read more
Video: HALFEN HIT Insulated connections for cantilevered structural components and balconies
Welcome to our HIT-Show house: sit back and enjoy the tour! This unique, virtual building contains numerous examples of our HIT insulated connections in use.

With its HIT Insulated connections, HALFEN provides a versatile and innovative range of products. The connections not only ensure optimum thermal insulation, they also fulfill the highest fire protection requirements as standard and can be used in many different installation situations.
read more
Fewer movement joints with the new HALFEN HIT Insulated connections
Following amendments to the DIBt approval Z-15.7-293 in November 2016 and further changes to technical approvals, Z-15.7-312 and Z-15.7-309, the distance between movement joints for propped balconies, access walkways and continuous parapets has increased by more than 100% to 23 metres.

HALFEN HIT Insulated connections fulfill the highest fire protection requirement according to REI 120 as standard. You can find our products as (Tekla) building components in BIM libraries and on the HALFEN PARTcommunity as CAD drawings. To ensure economic planning, HALFEN provides the HIT design software and a HALFEN ψ-calculator. Contact HALFEN at technical@halfen.co.uk, phone: 01582 470 300.
read more
Imprint
HALFEN Limited
A1/A2 Portland Close
Houghton Regis
LU5 5AW
Management:
Brian Davis, Mark Smith, Stuart Mills


Phone: +44 (0)1582-470300
Fax: +44 (0)1582-470304
Registered No. 02455626
sales@halfen.co.uk
Web: www.halfen.com/uk

PS: If you do not wish to receive this HALFEN Newsletter you can unsubscribe here at any time. Thank you.